• Full Automatic Fortune Cookie Production Line
  • Full Automatic Fortune Cookie Production Line
  • Full Automatic Fortune Cookie Production Line
  • Full Automatic Fortune Cookie Production Line
  • Full Automatic Fortune Cookie Production Line
  • Full Automatic Fortune Cookie Production Line

Full Automatic Fortune Cookie Production Line

Certification: CE, ISO9001
Power Source: Gas
Process: Forming and Baking
Automatic Grade: Automatic
Application: Biscuit, Snack
Customized: Customized
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
GYFC-200
Name
Full Automatic Fortune Cookie Production Line
Transport Package
Wooden Packing
Specification
200kg per hour
Trademark
GENYOND
Origin
China
Production Capacity
50 Sets Per Year

Product Description

Full Automatic Fortune Cookie Production LineAutomatic Biscuit-Making Machine with Signature is the production efficiency of cake professional equipment. Sign language is a kind of cake-like "gold ingot" folders within auspicious sign language paper sweet shortbread is a unique feature of Chinese food culture. Sign language generally used in cakes for dessert restaurants, entertainment can also be used as food. 
Characteristics: 
The buyer must provide the following utilities: 
A) Water: Water, electrical conductivity less than 3μ S 
B) power: 40KW 380V 50Hz 
C) Gas: 15kg / h 
D) compressed air: P = 8kg / cm 2; Compressed air Q = 1.2m3 

Project the number of units 

 

Yield  kg / hr 38
Whole weight  KG 6500
Size  L × W × H (mm) 8900 × 2000 × 2150 



Related note: 
1. All equipment: (machines and components) by the People's Republic of standards, safety regulations to create supply. 
2. All equipment: Power supply, voltage 380/220V ± 10% 50Hz, special purpose users, please note in advance. 
3. Plant construction manual, the equipment layout technology plans, electrical layout, etc. To be sent after signing a contract to pay. 
4. To send the guidance of the production line installation and commissioning engineers to guide the location of installation. For the installation to go abroad for staff travel costs and accommodation at the local, transportation and other costs borne by the demand side. 
5. The following is not within the scope of supply 
A. Plant and construction, design, construction (including the workshop with lighting, water supply, fire fighting system). 
B. Water, electricity, gas-owned (through production). 
C. Environmental protection facilities and equipment. 
D. Debugging packaging materials and bags. 
E. Self-demand-side of (Frederick) post-mortem room and a machine repair workshop. 
6. The complete sets of equipment in addition to the actual production equipment conditions, as varieties of raw materials, utilities conditions, skill level involved in the operation to another. 
7, the production line for 120 days, testing time is 30 ~ 50 days.

Full Automatic Fortune Cookie Production Line
Full Automatic Fortune Cookie Production LineFull Automatic Fortune Cookie Production LineFull Automatic Fortune Cookie Production Line


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now